Banner
Home > company's product > Lifting freight elevator
Rail type hydraulic lifting freight elevator

Rail type hydraulic lifting freight elevator

Product Details

The use of rail-type lifting freight elevator:
Cargo up and down on different floors of the building, fast up and down, large objects reach all floors
Applicable places:
Warehouses, factories, compartments, garages, mines, docks, airports, warehouses, supermarkets, etc.
Product advantages:
1. Channel protection: barrier-type and net-type
2. Channel door: hanging chain type, folio type
3. Channel table: anti-skid pattern plate, steel flat plate
4. Guide wheels and guide rails to make the lifting platform more stable
5. Four high-strength steel fixed derricks ensure operation: stronger and safer
6. High-strength manganese steel is used for the scissor arm: high strength and no deformation, ensuring long-term safety
7. Derrick door: opening and closing type, folding type, sliding type, etc. (optional)
8. The finishing pin is 45# carbon round steel, which has high strength and good wear resistance.
9. French Schneider for travel switch and intermediate relay
10. External power supply for convenient repair
11. Multi-point control at all working levels for convenient operation
12. Electric power or guide operation button
13. Operation warning lights or warning bells for lifting channels (optional)
14. Safety switch that closes the lifting channel circuit when the door is opened
15. Equipped with emergency lowering device during power failure
Product equipment:
1. External power unit for convenient repair
2. Multi-point control at all working levels for convenient operation
3. Explosion-proof electrical suitable for explosion-proof occasions (optional)
4. Warning lamp or warning bell for elevator operation
5. Safety switch that closes the lifting channel circuit when the door is opened
Construction instructions:
1. Before the equipment arrives at your company, ensure that the channel is emptied, the installation site is smooth and smooth, and the equipment can be transported to the installation point by forklift
2. Clean up in the pit without building waste or water accumulation, and do waterproof treatment
3. Contact the forklifts and cranes in advance to prepare for unloading and transportation to the pit
4. The installation location should ensure that 380V is connected
5. After installation, a rain shelter must be established immediately to prevent equipment damage

Inquiry